2025-2025 HASS Statment


Water Testing

Updated 7/15/2024

LBL Main Building
Water testing for lead was completed during the summer of 2024 by PBS Engineering and Environment LLC. Of the 38 samples taken, 37 came back with lead levels below the EPA acceptable lead action levels. One sample taken from the second floor custodial sink came back above the EPA acceptable lead level of 15 parts per billion (ppb). It was 60.9 ppb. That sink has been disabled and it is not used for potable water. Testing results are posted below:

Testing Results


Radon Testing


Asbestos Management


Integrated Pest Management