Silver Falls School District seeks an estimated 15 Category 6 network drops at 6 locations and estimated 3 single mode fiber (SMF) runs at 1 location. The approximate Category 6 footage total is 2,475 feet. Please see the attached RFP and cabling maps for details. Central Howell is the first location for walkthrough. Mandatory walkthrough is February 8th, 2023, starting at 2:00 PM and in the order listed in the summary of cabling. Attendance confirmation by February 6th is required. The bidding window closing date is February 24, 2023.

SFSD_FY2023_C2_IC RFP

SFSD_C2_RFP_2023-Cabling_map_CHE_v2_WALKTHROUGH UPDATE

SFSD_C2_RFP_2023-Cabling_map_VPE_v2_WALKTHROUGH UPDATE