Mt. Angel School District seeks an estimated 70-75 network drops in 9 rooms and the hallway in a single school. The locations listed are approximate, and will be finalized during the mandatory walkthrough and quoting process. The breakdown of approximate drops per location are provided in the detailed table is below. Each location specifications are detailed in the associated appendix shown on the table below. This is an installation only proposal. Proposals should include equipment, maintenance, installation cost and all applicable taxes and fees associated with such equipment. All cabling and hardware supplied must be new. The mandatory walk through is February 1, 2023 at 3:30 PM. Attendance confirmation is required. The bid submission deadline is February 10, 2023.
Posted: Jan 13, 2023